Ronstadt Transit Center, Downtown Tucson.  Trussed steel frames make up the exposed canopy frames.  These trussed frames were made from a total of 11,000 ft of 5” diameter steel pipe.  Also, there were two 60 ft high cooling towers.  The general contractor was Lloyd Construction. Completed February, 1991.